Chinese-made single-colour control card with LAN/WAN compatibility and offline playback from USB.
Listen · single-colour/dual-colour LED control card
Listen LS-T16 asynchronous LED controller
The T16 belongs to Listen's T series, for driving single-colour and dual-colour LED signs: it supports LAN and WAN communication (cluster control), and parameters can also be read back from a USB drive, allowing offline operation without a PC. The card handles 128 programmes, each with 16 content zones, and supports digital and analogue clocks, countdowns and a temperature sensor.
The software side is provided by the manufacturer's LED Player 6.0 application, and the card operates over a wide supply voltage range of 3.5-6V and an operating temperature of -40°C to +85°C. It is used primarily on smaller, simpler outdoor signs (shops, offices, smaller hoardings) where full-colour video playback is not a consideration.
Where the LS-T16 sits in an LED wall system
The simplest signal path: the card works straight onto the modules' ribbon cables, with no sending card, no receiving card and no Cat5e in the chain. The source is the 2 MB of internal memory, into which the programme can be loaded from the manufacturer's LED Player 6.0 software, over Ethernet (LAN or WAN) or from a USB drive; the parameters can also be read back from USB, which allows offline servicing without a PC. Up to 128 programmes can be stored, each with 16 content zones, and the card can display a digital or analogue clock, a countdown and temperature sensor data. It is not suitable for full-colour video: it is a controller for single- and dual-colour displays.
WHEN IT IS THE RIGHT CHOICE
On simple single- or dual-colour text and animated signs, where full-colour video is not needed but LAN/WAN-based cluster control matters.
WHAT TO WATCH OUT FOR
It is not a full-colour controller: it cannot display image or video content, only text, animation and clock-type content.
The LS-T16 in practice
The LAN/WAN capability is the real difference here: the card is reachable not only from the local network but over the internet, as a cluster, so the boards of several sites can be updated from one central point — this needs a fixed IP address or port forwarding on the local router, and has to be agreed with the client's IT staff at installation. The 3.5–6 V power input is wide, but here too the voltage drop on a long, thin power lead causes random restarts; wired to the 5 V rail shared with the modules, this is the most common fault. The -40 to +85 °C range applies to the card, not to the other parts of the display. It needs no internet to work: the programme is on the card and runs without a network. On replacement all 128 programmes are lost, so the LED Player project file has to be kept.
Alternatives to the LS-T16
If images or video are also needed on the board, this card is not suitable — a full-colour controller is required instead: an Onbon BX-6Q2 for a lintel board, a Huidu HD-C16L or HD-A3L for a larger, video-capable surface. If, on the other hand, single- or dual-colour text is enough and the shopkeeper would rather operate it from a phone, the Huidu HD-WF2 is more convenient with its built-in Wi-Fi and the LedArt mobile app, only without WAN cluster management. The deciding factors: whether remote, multi-site central management is needed, and whether text content is enough.
LS-T16 manual and datasheet
The documents live on the manufacturer's own site and open in a new window — so you always get the latest version. We do not copy or translate their contents.
Related asynchronous controllers
asynchronous LED controller — but what does it go into?
On its own the Listen LS-T16 is a component. With us it works inside these displays — design, manufacturing and installation included.

Design your own LED video wall
Enter the size, the location and what you want to show on it — the configurator works out the module count, the resolution and the power draw, and shows an indicative price. You do not have to give any contact details.
Open the configurator
Request an itemised quote
We put a figure on every part: panels, control system, support structure, travel and installation — itemised, with net prices. Based on your location and size we reply within one working day.
Request a quote
