Röviden

Work through this page in the order it is written and you will end with a specification rather than a wish. It takes you from choosing the position, through fixing the finished dimensions and the pixel pitch, to the wheeled poster as an alternative to building anything, and finally to how a 477 kilometre journey is priced when the site happens to sit beside a motorway junction.

LED wall in Nova Gradiška — manufacturing, installation, quote

Croatia 477 km from our plant in Győr

Nova Gradiska was laid out in 1748 as a Military Frontier settlement called Friedrichsdorf, and the geometry of that founding is still the town's most useful feature for anyone installing equipment: a planned centre around Trg kralja Tomislava with its formal park, straight approaches, and generous frontages that were never squeezed into a medieval street pattern. Eleven and a half thousand people live across the town area, a little under ten thousand of them in the urban part. What matters commercially, though, lies two minutes to the south: the A3 motorway and the industrial park beside it, 82 hectares with room to grow, where firms such as Klimaoprema and Atlantic Multipower have their operations.

Choose the position before you choose the size

Square, stadium, industrial park, showroom

The four positions that come up here behave differently enough that starting anywhere else wastes time. Trg kralja Tomislava and the park beside it are the town's formal centre, bounded by the baroque church of St Teresa of Avila, the municipal court, the tourist office and the town museum at number seven - a setting where a display has to be justified rather than merely permitted. The Gradski stadion, home of NK Sloga and holding around three thousand, is an open-air position read from terraces at a distance. The industrial park by the motorway is where a large surface raises no objection from anybody. A showroom or a reception interior is the fourth, and by far the most common in practice. Decide which of those you are in first, because the position determines the pitch, the housing, the brightness and the mounting method. Choosing a size first and then hunting for somewhere to put it is how projects acquire costs nobody budgeted for.

Convert your wall into a panel count

Horizontal steps of 32 centimetres, vertical steps of 16

Begin with the clear area you have and translate it into units. A panel is always laid on its side, 32 centimetres along the top and 16 down the edge, and it is never trimmed. What you can build is therefore a count across multiplied by a count upwards, giving a horizontal step of 32 centimetres and a vertical one of 16. Run a real case. A reception wall offering 4.2 metres of clear width accepts thirteen units at 4.16 metres, and the remaining four centimetres disappear behind the surround. Stacking twelve gives 1.92 metres of height; stacking fourteen gives 2.24. Choose the pairing that suits both the room and the shape of your material, and check that shape deliberately - a surface put up without that check spends its working life showing video framed by empty columns at either side.

Fix the resolution from the closest standing point

Three bands, and the saving from staying in the right one

Pace out the gap between the display and the closest place someone will habitually stand. Below roughly three metres - a reception counter, a shop floor, a meeting room - order within the P1.5 to P2.5 group. From about three metres out to eight, which takes in most showrooms and hall positions, the P2.5 to P4 group is the one. Past eight metres, and for anything taken in across the square or from the motorway approach, the P4 to P8 group is what belongs there. Having arrived at a band, stay inside it. Going one step tighter than the measurement warrants adds a great deal to the price of the surface and supplies detail that nobody standing in the room is capable of separating. Exterior installations carry two additions decided quite apart from resolution: an IP65 sealed enclosure, and daylight output in the order of 4,500 to 5,500 nit. Neither is a substitute for correct resolution and neither should be traded against it.

Consider the wheeled poster before committing to a build

Indoor output, and a controller that takes network, wireless and audio

Before you commit to a mounted wall, weigh up the LED poster. It is an upright unit on castors that requires no anchors, no working platform and no assessment of the building, since it bears on the floor and takes its supply from a socket. Specified for interior use it produces 700 to 800 nit, which is the right level in a foyer, a banking hall or a showroom; pushing an indoor unit brighter than that is unpleasant at close quarters and burns power for nothing. The controller inside it is what makes the product workable for a customer 477 kilometres from our door. Material reaches it either wirelessly or through a UTP network cable, meaning a unit standing in a lobby needs nothing pulled to it, and an audio port lets sound-carrying content play from the unit itself instead of borrowing a separate system. A dealership on the motorway approach, a pharmacy near the square or the reception of a company in the industrial park can be running a live digital display days after delivery without a single anchor going into a wall.

Prepare the permit documentation early

What we hand over, and where our role ends

Anything visible from the street will meet local rules, applied with noticeably more attention around the planned centre and its park than beside the motorway. Forecasting the outcome is not something a manufacturer can honestly do, and we make no undertaking about consent; the ruling belongs to the authority alone. Lodge the submission in parallel with the order rather than afterwards. From us come the technical annexes: an elevation setting out the surface where it will sit, the fixing arrangement with the forces it introduces, the connected demand and the point it is taken from, the output levels with their evening reduction timetable, and the enclosure rating. Where a landlord or a building association has a say, secure the written permission during the same period, because that document holds up more projects here than any technical question does.

Budget the journey as its own line

477 kilometres, and why the motorway matters

The road distance from our Gyor workshop to Nova Gradiska is 477 kilometres, and almost all of it is motorway, with the town sitting directly on the A3 corridor. That has a practical effect: the last part of the journey is short and predictable, so a crew arriving at nine in the morning after an overnight stay is a realistic plan rather than an optimistic one, and a same-day survey visit is entirely feasible. On the quotation the travel appears separately from the equipment - the kilometres, the crew's subsistence and any hotel night each on their own row - so a small project is not silently charged the logistics of a large one. Delivery includes spare panels for your own store, which is what keeps a fault at this range down to a module swap rather than a wait. The warranty term is one year or two according to the build selected, and it is stated on the offer rather than described in general terms.

Related pages

Why we are the safe choice
  • In-house manufacturing and on-site installation
  • A licensed electrical engineer on every project
  • Warranty + service team in Hungary
  • On the market since 2014 — Kormos Ádám, villamosmérnök-oktató, 30 év tapasztalat
Opten „A” minősítés 2025Bisnode / Dun & Bradstreet „A”Minősített tanúsítvány